Extended Aeration Design Criteria: SRT, HRT, F/M & More
Extended Aeration Design Criteria: SRT, HRT, F/M, MLSS and Sizing Guide
Getting the design criteria right is what separates an extended aeration plant that quietly meets its permit for decades from one that struggles with poor settling, high effluent ammonia or a blower that cannot keep up. This guide walks through the extended aeration design criteria engineers use to size a plant: the key parameters, the load basis, aeration tank and oxygen calculations, clarifier sizing, and a worked example.
This article is educational. Final design must follow your state’s design standards (many states use the Ten States Standards or an equivalent) and be prepared and approved by a licensed engineer.
New to the process? Read how extended aeration works first, or compare it with other options in our guides on advantages and disadvantages and extended aeration vs conventional activated sludge.
Step 1: Define the Design Basis
Every calculation starts with the loads. Collect and confirm:
- Flows: average daily flow, maximum day, and peak hour flow (peaking factors are higher for small plants and for plants with large infiltration/inflow)
- Influent loads: BOD₅, TSS, TKN/ammonia, total phosphorus, FOG
- Alkalinity and pH of the raw wastewater
- Temperature: minimum design water temperature is critical for nitrification
- Effluent limits: BOD, TSS, ammonia, total nitrogen, phosphorus, disinfection, and any seasonal limits
- Industrial or seasonal contributions: food processors, campgrounds, tourism peaks
Under-estimating peak loads or the cold-weather condition is the most common cause of plants that fail to meet permit.
Step 2: Key Extended Aeration Design Parameters
The table below lists typical ranges. Final values depend on permit limits, temperature and state standards.
| Parameter | Typical range | Why it matters |
|---|---|---|
| Sludge retention time (SRT) | about 20 to 40 days | Controls nitrification, sludge stability and sludge production |
| Hydraulic retention time (HRT) | about 18 to 36 hours | Sets aeration tank volume |
| Food-to-microorganism ratio (F/M) | about 0.05 to 0.15 lb BOD/lb MLVSS/day (references based on MLSS cite lower values) | Low loading drives endogenous respiration and low sludge yield |
| Volumetric loading | about 6 to 25 lb BOD₅/1,000 ft³/day (0.1 to 0.4 kg/m³/day) | Quick check of tank size against load |
| MLSS | about 3,000 to 6,000 mg/L | Biomass concentration; affects tank size and clarifier loading |
| MLVSS/MLSS ratio | about 0.65 to 0.75 | Extended aeration sludge has more inert solids because of long SRT |
| Return activated sludge (RAS) | about 75 to 150 percent of average influent flow | Keeps biomass in the aeration tank; must be adjustable |
| Dissolved oxygen | about 2 mg/L in the aeration tank | Needed for BOD removal and reliable nitrification |
| Primary clarifier | usually not used | Screening and grit removal replace it |
Step 3: Size the Aeration Tank
There are two common ways to get volume, and good designers check both.
By hydraulic retention time:
V = Q × HRT
By F/M or volumetric loading:
V = (BOD load) / (volumetric loading), or V = (BOD load) / (F/M × MLVSS)
Then confirm the SRT is long enough for nitrification at the minimum temperature. For nitrification, design SRT = safety factor × minimum nitrifier SRT at the design temperature. Safety factors of roughly 1.5 to 2.5 are used to cover peak loading and operating uncertainty, and the aerobic fraction of the SRT is what counts when anoxic zones are included.
Step 4: Calculate Oxygen Requirements
Oxygen demand is the single most important input for blower and diffuser sizing. The actual oxygen requirement (AOR) is the sum of:
- Carbonaceous demand, including endogenous respiration (higher at long SRT)
- Nitrogenous demand: about 4.57 lb O₂ per lb of ammonia-nitrogen nitrified
- Minus a denitrification credit (about 2.86 lb O₂ per lb of nitrate-nitrogen denitrified) if you have an anoxic zone
The AOR must then be converted to the standard oxygen requirement (SOR) that the equipment is rated for. That conversion depends on alpha (wastewater transfer factor), beta, temperature, elevation, dissolved oxygen setpoint and diffuser submergence. Fine-bubble diffusers in municipal wastewater are often designed with alpha factors in the range of roughly 0.5 to 0.65, but always use supplier data and a fouling factor. In practice the SOR is typically around two to two-and-a-half times the AOR.
Beyond oxygen, check that the aeration system provides enough mixing energy to keep solids suspended at minimum turndown, and design blowers with turndown, redundancy (N+1) and automatic DO control to avoid wasting energy.
Step 5: Account for Alkalinity and pH
Nitrification consumes about 7.14 lb of alkalinity (as CaCO₃) per lb of ammonia-nitrogen oxidized, and denitrification returns roughly half of it. Plants are usually designed to keep a residual alkalinity (commonly around 50 mg/L or more as CaCO₃) so pH stays in the 6.5 to 8 range. If raw alkalinity is low, include chemical feed (soda ash, sodium bicarbonate or caustic) in the design.
Step 6: Size the Secondary Clarifier
The clarifier often limits plant capacity, so extended aeration clarifiers are sized conservatively. Check both:
- Surface overflow rate (SOR) at average and peak flow. Typical values are about 200 to 400 gpd/ft² at average design flow and about 600 to 800 gpd/ft² at peak flow.
- Solids loading rate at peak flow including RAS, using the design MLSS. Typical values at average flow are roughly 0.2 to 1.0 lb/ft²/hour, with higher allowances at peak.
- Side water depth (commonly about 10 to 14 ft or more), weir loading, and inlet energy dissipation.
Sizing the clarifier on average flow alone is a common mistake. Peak flow and RAS recirculation can push solids out the weir even when the aeration tank is fine. An integrated clarifier built into the aeration structure is one way to save footprint, but it still needs to be sized for peak hydraulic and solids loading.
Step 7: Plan Sludge Wasting and Handling
Waste activated sludge flow is set by the SRT:
Qw ≈ (V × MLSS) / (SRT × RAS solids concentration)
Because extended aeration sludge is already well stabilized, it can often go to a sludge holding tank, thickening, drying beds or dewatering. Size holding and handling for the real wasting volume and for the seasons when hauling is limited.
Worked Example: 0.5 MGD Extended Aeration Plant
Illustrative only. Assumptions: average flow 0.5 MGD, influent BOD₅ 250 mg/L, influent TKN 45 mg/L, MLSS 4,000 mg/L, MLVSS/MLSS 0.70, HRT 24 hours, 95 percent BOD removal.
| Item | Calculation | Result |
|---|---|---|
| Aeration tank volume | 0.5 MGD × 24 h / 24 | 0.5 million gal (about 66,800 ft³) |
| BOD₅ load | 0.5 × 250 × 8.34 | about 1,040 lb/day |
| Volumetric loading | 1,040 / 66.8 (thousand ft³) | about 15.6 lb/1,000 ft³/day (within typical range) |
| MLVSS | 4,000 × 0.70 | 2,800 mg/L |
| Biomass in tank | 2,800 × 0.5 × 8.34 | about 11,700 lb |
| F/M | 1,040 / 11,700 | about 0.09 (within typical range) |
| BOD₅ removed | 1,040 × 0.95 | about 990 lb/day |
| Carbonaceous oxygen (assume 1.2 lb O₂/lb BOD removed) | 990 × 1.2 | about 1,190 lb O₂/day |
| Nitrified N (assume 36 mg/L) | 0.5 × 36 × 8.34 | about 150 lb/day |
| Nitrogenous oxygen | 150 × 4.57 | about 690 lb O₂/day |
| Total AOR (no denitrification credit) | 1,190 + 690 | about 1,880 lb O₂/day |
| Alkalinity consumed | 36 mg/L × 7.14 | about 257 mg/L as CaCO₃ (check raw alkalinity!) |
| Clarifier area at 300 gpd/ft² average | 500,000 / 300 | about 1,670 ft² (about 46 ft diameter) |
| Peak check (peaking factor 2.5, 800 gpd/ft² limit) | 1,250,000 / 800 | about 1,560 ft², so average governs here |
Two takeaways: the nitrification alkalinity demand (257 mg/L) is larger than many raw wastewaters contain, and the clarifier must still be checked for solids loading with RAS at peak flow before it is accepted.
Common Design Mistakes to Avoid
- Designing for average flow and ignoring peak flow, infiltration/inflow or seasonal peaks
- Ignoring the minimum water temperature when setting SRT
- Forgetting alkalinity demand from nitrification
- Undersized clarifier or inadequate RAS capacity
- Blowers without turndown, redundancy or DO control
- Poor screening and grit removal, since there is no primary clarifier to protect the process
- No equalization for industrial or highly variable loads
- No allowance for foam, grease and scum removal
- Sludge holding and hauling capacity that does not match the real wasting rate
Design Support from BIOWORKS
BIOWORKS provides process design services for extended aeration plants and lagoon upgrades, using the OXIWORKS® aeration system for efficient fine-bubble oxygen transfer. A process guarantee is available where BIOWORKS supplies or approves the key treatment components. BIOWORKS reports that its extended aeration process, installed in 120+ plants in 25 countries, can achieve effluent below 5 mg/L BOD, 10 mg/L TSS and 1 mg/L ammonia-N depending on site and influent conditions.
See the full Extended Aeration Activated Sludge System page, or upgrade options in Aerated Lagoon solutions.
Frequently Asked Questions
What are the typical design criteria for extended aeration?
Typical criteria are an SRT of about 20 to 40 days, an HRT of about 18 to 36 hours, an F/M ratio of about 0.05 to 0.15, MLSS of about 3,000 to 6,000 mg/L, and RAS of about 75 to 150 percent of average flow, with final values set by permit limits, temperature and state design standards.
How do you calculate the aeration tank volume for extended aeration?
Multiply the design flow by the hydraulic retention time (V = Q × HRT), then check the result against volumetric BOD loading and the F/M ratio, and confirm the SRT is long enough for nitrification at the minimum temperature.
How is oxygen demand calculated for extended aeration?
Add carbonaceous oxygen demand (including endogenous respiration) and nitrogenous demand of about 4.57 lb O₂ per lb of ammonia-nitrogen nitrified, subtract any denitrification credit, then convert actual oxygen requirement to standard oxygen requirement using alpha, temperature, elevation and DO.
How do you size the clarifier for an extended aeration plant?
Check both surface overflow rate and solids loading rate at average and peak flow including RAS, and provide adequate side water depth and weir length. Peak flow often governs the design.
Why is alkalinity part of extended aeration design?
Nitrification consumes about 7.14 lb of alkalinity per lb of ammonia-nitrogen oxidized, so plants with low raw alkalinity need chemical addition to keep pH stable and nitrification working.
Talk to a Process Engineer
Planning a new plant, a lagoon upgrade or an aeration retrofit? Contact BIOWORKS North America to review your flows, loads and permit limits with our process engineers.

